CDM Projects
- § Select Sector
- Power generation
- Methane recovery
- Energy efficiency
- Fuel switching
- Forestry
Macedonia / Skopje ENERGY EFFICIENCY AND USE OF RENEWABLE ENERGIES IN THE SCHOOLS AND KINDER-GARDENS IN THE MUNICIPALITY OF KARPOS, SKOPJE Fuel switching
The main goal of the project activity is to apply, through the Clean Development Mechanism, several measures for heating energy savings and production of electricity from renewable. This means that the implementation of the project would allow saving a certain amount of energy which would influent directly the reduction of the negative effects from climate changes. It is also possible to include the replacement of the non efficient street lights with more efficient ones as an additional activity.
Macedonia / Tetovo CDM PROJECT IDEA FOR THE TEXTILE INDUSTRY “TETEKS” IN TETOVO Fuel switching
The textile factory Teteks was built during the 50’s and worked intensively until the late 80’s when the commercial activities suffered a considerable damage due to the economy in transition. The factory produces several types of natural wool and artificial raw textile fabric. Both of the production technologies require energy consumption.
Macedonia / Negotino RENEWABLE ENERGY FROM VINEYARDS PRUNING RESIDUES IN NEGOTINO VALLEY Power generation
The Macedonian region of Povardarie, in the central part of the country and along the river Vardar, is the largest and most famous grape growing region in Macedonia, where 85% of Macedonian wine is being produced. One of the biggest wineries in the region is the private-owned winery "Povardarie" a.d., located in the Municipality of Negotino, where there are 4.200ha of vineyards. The company is producing 6.000.000 l of wine and 100.000 l of brandy annually.